400 mThe platform

Our platform is not lifted.
It returns.

Open-frame AquaAether desalination plant on a steel platform on the seabed

The term

Negative-lift servicing

Servicing where the equipment returns to the surface and nothing is lifted.

300 mHow it works

How it comes back up.

When the desalination plant needs maintenance, it’s released on the seafloor and rises to the surface on its own buoyancy.

200 mThe service cycle

The service cycle.

01

On the seabed

Plant & equipment do the work at depth.

02

It returns

Released from its cradle, the plant rises up on its own buoyancy.

03

Serviced at surface

Crews service at sea level, in daylight.

04

Pulled back down

A tug pulls the plant back down and anchors it into its cradle.

100 mWhat leaves the cycle

Only a tug is needed.

No large construction vessel. No crane. No ROV.

Today Large construction vessel + work-class ROV

USD 355,000 – 910,000 a job

USD 71,000 – 91,000 a day [1] [2] · 5–10 days*

AquaAether Tug

USD 46,000 – 72,000 a job

USD 23,000 – 36,000 a day [3] [4] · 2 days*

*Estimates only.

AquaAether servicing costs are about 80% less. [5]

25 mIntellectual property

Patent-pending.

International application

PCT/ZA2026/050012

Priority date

28 Feb 2025

Scope

Covers subsea desalination.

What goes down must come up.

AquaAether is talking to investors, operators and engineering partners.